13.03.2019

Back to news

Delivery of oversized Equipment for the construction of a complex preparation unit for natural and associated petroleum gas to Yarakta and Markovo OGCF

The development of the gas part of the field of LLC Irkutsk Oil Company has begun at the Yarakta oil and gas condensate field (OGCF). It includes the construction of a complex preparation unit for natural and associated petroleum gas (UPPPNG). This unit is designed for the extraction and subsequent preparation of commercial propane, butane and gas condensate from a mixture of natural and associated petroleum gas. The mixture of propane and butane technical (LPG) will be transported via a 196 km long product pipeline from the Yaraktynsky OGCF via Markovskoye OGCF to the receiving, storage and shipment complex of liquefied petroleum gases (LPG) in Ust-Kut.

In cooperation with LLC Key Point Logistics and by the efforts of the project teams of LLC Barrus. Project Logistics and Special Transport and Engineering the delivery of oversized Equipment were successfully performed to Yarakta and Markovo OGCF with total volume more than 35000 FRT.